ADVERTISEMENT
Advertisement
For Students

The Human Factor: Can India Train Enough Engineers to Run the Fabs It's Building?

|
A Silver or Gold membership is required to read and print this article.

India can pour concrete and sign MoUs faster than it can produce a trained fab technician. Semicon India 2026 made talent development a running theme across all three days  and put a hard number on the gap the country still has to close.

India has set a target of building a pool of 85,000 skilled semiconductor professionals within this decade, many reports claim this goal has already achieved, That figure sat alongside a set of numbers that, taken together, explain why talent has become the sixth and arguably most urgent pillar of Semicon 2.0: twelve projects worth more than ₹1.64 lakh crore approved across six states, and  as of the event itself  five facilities in commercial production. Every one of those plants needs process engineers, test engineers, technicians and reliability engineers who simply did not exist as a workforce category in India five years ago. An EY report launched on the event's final day, titled Semicon India 2.0: From Capacity Creation to Ecosystem Leadership, projects India's semiconductor market growing from nearly USD 64 billion in 2026 to USD 200 billion by 2035, and frames the entire trajectory as dependent on converting domestic design talent into manufacturing and packaging leadership  not simply on building more plants.
The design pipeline: C2S and ChipIN
On the design side, the Chips to Startu...

This article requires a Silver or Gold membership
Silver+ members only
Continue reading with a subscription.
1 USD = Rs 96.96
  • Deep-technical articles & analysis
  • New-product comparisons
  • Premium online courses
  • 1 author article / year